Grain-systems Tanks PNEG-4075G User Manual Page 130

  • Download
  • Add to my manuals
  • Print
  • Page
    / 170
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 129
Chapter 8: Accessories
NOTE: The table above shows the correct ladder step and part number to be installed in the corresponding
hole in the roof rib. Shaded areas also show the correct roof exhauster ladder step and part
number with the corresponding hole in the roof rib.
Roof Ring Placement
The roof ring is a tubular ring bolted to the exterior of the roof.
The placement location and quantity of roof ring kits vary with the size of each bin. The exhauster roof ring
(A) on the 75 ft bin will be installed in the seventh roof panel rib hole from the top. The eave roof ring (B)
will be installed in the last roof panel rib hole located at the eave end of the bin. The roof support ring (C)
will be installed in the sixth hole up from the bottom of the eave.
NOTE: If ladder steps have been installed, and not already omitted, remove the ladder step that is installed
in the same roof panel rib hole in which the roof ring will be installed.
Figure 8-2 Roof ring location on bin
A
Exhauster roof ring kit (CRP-7228-XX)
3
B
Eave roof ring kit (CRP-5496-XX)
4
C Roof support ring (CRP-4890)
130 Pneg-4075G 75 Ft Diameter 40-Series Bin
3. (-XX) denotes the bin diameter.
4. (-XX) denotes the bin diameter.
Page view 129
1 2 ... 125 126 127 128 129 130 131 132 133 134 135 ... 169 170

Comments to this Manuals

No comments