Grain-systems Bin Accessories PNEG-1615 User Manual Page 20

  • Download
  • Add to my manuals
  • Print
  • Page
    / 26
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 19
2. Installation
20 PNEG-1615 Heavy Duty Bin Stairs and Platform Assembly for 4.00" Corrugated Bin
Figure 2U Handrail Post Connection to Horizontal Wall Bracket
2. Begin installation with the upper handrail. The handrail for the first two (2) steps should be loosely
bolted to the first post and checked to ensure it is the right length. Excess length of the narrow end
of the handrail may need to be cut off and a new hole drilled for connection to the top platform
handrail. Use 5/16" x 1-1/4" bolts at the connections. Continue down the stairs installing handrail
sections to the handrail posts. Extra force maybe needed to curve the handrail on smaller diameters.
Refer to Figure 2V below and Figure 2W on Page 21 for connections.
Figure 2V Upper Handrail Connection
Handrail post
(LDR-4085)
Two (2) 3/8" x 1" Flange
head bolts and nuts
5/16" x 1-1/4"
Bolt and nut
Page view 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 26

Comments to this Manuals

No comments