Grain-systems Bin Accessories PNEG-1615 User Manual Page 12

  • Download
  • Add to my manuals
  • Print
  • Page
    / 26
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 11
2. Installation
12 PNEG-1615 Heavy Duty Bin Stairs and Platform Assembly for 4.00" Corrugated Bin
Assembling the Platform
1. Figure 2F shows the assembly of the platform supports. Use 5/16" hardware at all the connection
points. Note the center floor brace (LS-6701) is offset from the center of the platform. (The bin wall
is hidden for clarity.)
Figure 2F
2. Figure 2G shows the assembly of the platform floor, toe plate and vertical angles. This must all be
assembled at the same time using 5/16" hardware. Note the color codes, placement and orientation
of the platform vertical angles.
Figure 2G
Page view 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 25 26

Comments to this Manuals

No comments