Grain-systems Bin Accessories PNEG-1615 User Manual Page 24

  • Download
  • Add to my manuals
  • Print
  • Page
    / 26
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 23
2. Installation
24 PNEG-1615 Heavy Duty Bin Stairs and Platform Assembly for 4.00" Corrugated Bin
5. Figure 2AC shows the addition of the steps. Three (3) steps will be located above the rest platform
and four (4) are located below the rest platform. The first step above the platform will need to be
securely attached to the handrail and toe plate. A field drilled 3/8" hole will need to be placed in the
handrail in line with the slot in the step. Self-tapping screws will need to be placed in the top of the
step for connection to the toe plate.
Figure 2AC
6. Next the handrail posts can be attached as shown in Pages 19-21 of the manual. NOTE: The handrail
for the stair section above the rest platform will need to be cut to length. A hole will have to be
drilled in the handrail to attach to the handrail post. It can be attached in the same way as previous
discussed in the manual.
Page view 23
1 2 ... 19 20 21 22 23 24 25 26

Comments to this Manuals

No comments