2. Installation
22 PNEG-1615 Heavy Duty Bin Stairs and Platform Assembly for 4.00" Corrugated Bin
Assembling Intermediate Platform (Optional Package #STR1143)
1. The intermediate platform wall brackets and bordering stair section wall brackets should be arranged
as shown in Figure 2Y. The first platform bracket should be placed three (3) bolt spaces around the
bin and 32" below the previous stair wall bracket. The next platform bracket should be placed six (6)
bolt spaces around the bin at the same height as the previous platform bracket. The next stair wall
bracket is placed four (4) bolt spaces around the bin and 32" below the second platform wall bracket.
In each instance, the wall brackets should be attached to the bin with three (3) bolts. One hole will
have to be drilled in the bin sidewall at the third bolt’s location.
Figure 2Y
2. Figure 2Z shows the assembly of the platform supports. Use 5/16" hardware at all the connection
points. Note the center floor brace (LS-6701) is offset from the center of the platform. (The bin wall
is hidden for clarity.)
Figure 2Z