Tower Dryer Operations & Service
The electrical box on the GSI Tower Dryer.The electrical box on the GSI Tower Dryer.
The electrical box on the GSI Tower Dryer.The electrical box on the GSI Tower Dryer.
The electrical box on the GSI Tower Dryer.
INSTALLATION REQUIREMENTS
Electrical
The dryer can be furnished to operate off of 240,
480, or 575 volt, 60 Hz power or 380 volt, 50 cycle
power. The dryer is furnished with a power panel
equipped with a main circuit breaker disconnect and
motor starters and branch breakers for the individual
blower motors. Standard blower motor starting is
across-the-line starting. When necessary, the dryer
can be equipped with optional soft-start motor
starting equipment.
No dry grain conveyor is furnished with the
dryer, however, a 10 hp motor starter for a dry grain
conveyor is furnished in the control panel. If the dryer
is ordered with a demand fill, a 10 hp motor starter is
also provided in the control panel to operate a wet
conveyor.
GSI personnel will perform all necessary
dryer wiring from the power panel to the dryer. The
customer is responsible for bringing electrical power
into the main circuit breaker and also for wiring the
unload (and load) conveyor.
A wiring diagram is furnished with each
dryer. Extensive safety controls are used on the
dryer for equipment and personnel protection
and should not be bypassed.
Fuel
The burner is designed to burn either natural gas or
propane vapor fuel. The volume of fuel supplied must
be sufficient to maintain a minimum of 7 to 10 psi
pressure when the burner is operating at rated capac-
ity.
When propane is used as the fuel source,
external propane vaporizers must be used in order to
supply vapor gas to the dryer. Vaporizers must be
sized to the burner capacity of the dryer. Fuel
pressure to the dryer must be regulated to approxi-
mately 10 psi.
GSI personnel will plumb all necessary gas
piping from the dryer's gas shutoff valve to the burner.
The customer must provide fuel to the gas shutoff
valve.